Relamping Standard’s Warehouse

Standard Project

 

April 11 2016

In August 2015, Standard relamped its warehouse in Ville Saint-Laurent, PQ, improving workplace safety and energy costs. The warehouse, which has 35-ft ceilings and 16 alleys, operates 11 hours a day, five days a week.

To better light the aisles, Standard replaced HID metal halide lamps (MH400 consuming 458 watts) with LED high bay luminaires (LPHB/6MS, 175 watts). Traditional T8 lamps (32 watts) were substituted with T8 LED lamps (22 watts). To avoid unnecessary lighting in the aisles, Standard installed 60 occupancy sensors to cover the 180 luminaires.

In the aisles, the company noticed a significant lighting improvement: where the light meter previously read 108 lux, it now reads 185 lux.

These changes represent a savings of 170 000 kilowatt-hours or $16,000 per year in energy costs. “It changes everything,” says one employee. “It’s brighter! Now, we can clearly see the bottom row of the products and we feel safer.”
{loadposition slideShow15}

Related Articles


Changing Scene

  • LightForm Appoints Christine Vieira as New GTA Team Lead

    LightForm is delighted to announce the promotion of Christine Vieira to the position of GTA Team Lead. Over her six-year tenure with LightForm, Christine has demonstrated exceptional leadership and deep product knowledge, becoming a vital asset to both the company’s customers and team members. Her ability to effectively convey the unique stories of it’s core… Read More…

  • Dainolite Expands Reach with New Lighting Agency Appointments

    Dainolite is thrilled to announce the appointment of several new commercial lighting agencies in the Ontario region. This strategic move is aimed at expanding the company’s market presence and enhancing it’s ability to deliver innovative decorative lighting solutions to the commercial industry. The new agencies, selected for their extensive industry expertise and strong market presence,… Read More…


Design

  • Project Story: Sainte-Thérèse High School Outdoor Lighting Upgrade

    Project Story: Sainte-Thérèse High School Outdoor Lighting Upgrade

    August 6, 2024 Built in 1980, the building that houses Sainte-Thérèse high school, in Quebec Canada, was looking a little worse for the wear. Renovation work began with two major projects: introducing a multidisciplinary sports centre, as well as redesigning the parking lots.  The employee and visitor parking lots were completely reconfigured during phase 1… Read More…

  • Resilience Illuminated: Reviving Westminster Pier Park After Devastating Fire

    Resilience Illuminated: Reviving Westminster Pier Park After Devastating Fire

    In September 2020, the picturesque city of New Westminster near Vancouver in British Columbia suffered a devastating setback when an intentionally set fire destroyed much of the city’s waterfront park, including its urban beach, sand volleyball courts, and iconic art installation known as Wow Westminster. The fire, which burned for ten days before firefighters could… Read More…


New Products

  • Magic Lite: Tri-Proof Lights

    Magic Lite: Tri-Proof Lights

    Tri-Proof Lights are a durable lighting solution that can replace traditional linear fluorescent luminaires. Tri-Proof Lights are designed for a variety of applications requiring, dust-, moisture- and impact-resistance. Suitable environments such as corridors, stairwells, warehouses, parking garages and car washes allows this versatile fixture in a variety of applications. Read More…

  • Leviton: Decora Smart ELV/LED Phase Selectable Dimmer, Wi-Fi 2nd Gen, Neutral Wire Required

    Leviton: Decora Smart ELV/LED Phase Selectable Dimmer, Wi-Fi 2nd Gen, Neutral Wire Required

    Introducing Leviton’s Decora Smart Electronic Low Voltage/LED Phase Selectable Dimmer Switch with Wi-Fi 2nd Gen., for 600VA ELV, 300W LED, 300W CFL, and 600W Incandescent/Halogen lights, with wallplate included. These switches come in white. Read More…