Leviton Expands Camargo Manufacturing Facility 80,000 square feet in Chihuahua, Mexico

March 30, 2023

Breaks ground on 80,000 sq. ft. production facility to support growing customer needs

 Leviton recently announced the expansion of its manufacturing facility in Camargo, Mexico.

About the Camargo Facility Expansion

The over 80,000 square foot facility will house several new production lines and a distribution center for more efficient operations, as well as areas that benefit employees such as dedicated offices, a cafeteria and recreational center. The new facility will add 300 positions to the Leviton workforce in the region.

Michael Mattei, executive vice president & general manager, Leviton Commercial & Industrial

“We’ve been manufacturing products in Camargo for over 25 years and are extremely excited to be expanding our footprint yet again in this region,” said Michael Mattei, executive vice president & general manager, Leviton Commercial & Industrial. “As customer needs and dynamics shift, we’re staying ahead in terms of how we meet demand and develop new products. In this new space, we’re adding technology and manufacturing capabilities that will allow us to even better serve our customers.”

Michael Mattei, executive vice president & general manager, Leviton Commercial & Industrial

The facility will manufacture products for all four Leviton business units and serve customers across the world. Incorporating automation and new technology in the facility will also improve Leviton’s ability to meet capacity demands, improve lead times and bring new products to market in a faster and  more sustainable manner.

Leviton Supporting its Goal for Carbon Neutrality

Camargo facility expansion

Focusing on reducing its overall environmental impact and empowering and enabling customers to be more sustainable, Leviton’s goal to achieve company-wide Carbon Neutrality by 2030 (CN2030) will be reflected in the construction and the expansion of the Camargo facility.

“It was important to incorporate our CN2030 efforts in building this facility,” said Jaime Estrada, vice president, Chihuahua Operations. “As Leviton strives for carbon neutrality by 2030, the expanded Camargo facility will adhere to Green Building Initiative standards.”

Jaime Estrada, vice president, Chihuahua Operations

Leviton expects to complete construction later this year.

More information available Here

Related Articles


Changing Scene

  • Grand Opening: Legrand BCS Office in Markham

    Legrand is thrilled to announce the grand opening of their new BCS facility in the heart of downtown Markham, ON, located at 85 Enterprise Blvd, Suite 400, which is set to take place on Thursday, September 19th, 2024. “Our facility in Vaughan will remain open to continue to stock inventory for Canada for all Legrand… Read More…

  • Leviton Canada Achieves Another Year of Carbon Neutrality

    Leviton Canada proudly reaffirms its commitment to sustainability by achieving carbon neutrality once again in 2023. The company has significantly reduced their environmental footprint by 32% compared to 2022, with a substantial impact on transportation. Despite having energy-efficient lighting and relying on hydropower—a clean and renewable energy source—for their facility, transportation (both upstream and downstream)… Read More…


Design

  • Project Story: Sainte-Thérèse High School Outdoor Lighting Upgrade

    Project Story: Sainte-Thérèse High School Outdoor Lighting Upgrade

    August 6, 2024 Built in 1980, the building that houses Sainte-Thérèse high school, in Quebec Canada, was looking a little worse for the wear. Renovation work began with two major projects: introducing a multidisciplinary sports centre, as well as redesigning the parking lots.  The employee and visitor parking lots were completely reconfigured during phase 1… Read More…

  • Resilience Illuminated: Reviving Westminster Pier Park After Devastating Fire

    Resilience Illuminated: Reviving Westminster Pier Park After Devastating Fire

    In September 2020, the picturesque city of New Westminster near Vancouver in British Columbia suffered a devastating setback when an intentionally set fire destroyed much of the city’s waterfront park, including its urban beach, sand volleyball courts, and iconic art installation known as Wow Westminster. The fire, which burned for ten days before firefighters could… Read More…


New Products

  • GB Agencies: HELIX2-LED Area Light

    GB Agencies: HELIX2-LED Area Light

    The HELIX2-LED is a highly versatile fixture designed with a full range of beam distribution options (Type II, III, IV, V), rotatable optics, glare control shields, and control options to create the perfect, most optimized lighting layout for your area. This standard fixture has all-in-one features including 120-347V, Colour Selection, and Lumen Adjustability. The HELIX2-LED Series is… Read More…

  • Eureka Introduces Velia Tubular Luminaire

    Eureka Introduces Velia Tubular Luminaire

    Eureka has recently announced the release of its Velia luminaire. The versatile family is offered in a variety of colors, textures, lengths, and configurations to meet a space’s specific aesthetics. Unique tubular arrangements can be created with Velia; 36 preconfigured clusters are available. Designers can select from three canopy types and then choose one, three,… Read More…