Bill 151 — Waste Free Ontario Legislation Receives 2nd Reading

Waste Free Ontario Bill

March 10, 2016

Bill 151, Waste-Free Ontario Act, intended to overhaul the province’s recycling regime, has received second reading and is being debated. The purpose of the proposed legislation is to support a shift to a circular economy by
–   reducing waste and increasing resource productivity
–    enabling efficient and effective collection and recycling systems
–    increasing market value of recovered materials

The bill is being driven in part by stalled waste diversion rates, which have remained at 25% of waste generated for 10 years. While most of the waste diversion is coming from the residential sector, where 47% of household waste is diverted from landfill, the diversion rate for the rest of the economy is much lower.
Under the province’s proposed strategy, the Ministry of the Environment & Climate Change would begin designating new materials for waste diversion this year. The first set of potential candidates could include fluorescent light bulbs and tubes, additional electronics, and batteries.

Adopt a circular economy model in the lighting industry may involve considering how products are made, what they are made with, and what happens to them when they reach the end of their life. For example, options for lighting manufacturers include:
–    increasing the use of materials derived from recycled sources. Purchasing recycled materials helps to make recycling more sustainable
–   creating modular or upgradeable product designs to avoid discarding an entire luminaire if a single component fails
–    avoiding combinations of materials (e.g., plastics and metals) that prevents them from being recycled
–    collecting electrical waste that arises when your customers install your products
–    re-using components when taking back used or faulty products
–    powering manufacturing facilities from renewable sources

Read the province’s draft strategy for a waste free Ontario here: http://www.downloads.ene.gov.on.ca/envision/env_reg/er/documents/2015/012-5834_DraftStrategy.pdf.
Bill 151 was posted on the Environmental Registry for 90 days for public consultation and comment. The consultation period ended February 29. The ministry is expected to respond with revisions to the proposed act in spring 2016.

Read Bill 151 here: http://www.ontla.on.ca/web/bills/bills_detail.do?locale=en&BillID=3598.

If you have questions or concerns, contact Wayne Edwards at wedwards@electrofed.com or Cherith Sinasac at csinasac@electrofed.com.

For full details, including information on Product Care’s Interim Lamp Program, visit http://www.electrofed.com/blog/2016/03/03/sustainability-waste-free-ontario-act/.

Related Articles


Changing Scene

  • LightForm Appoints Christine Vieira as New GTA Team Lead

    LightForm is delighted to announce the promotion of Christine Vieira to the position of GTA Team Lead. Over her six-year tenure with LightForm, Christine has demonstrated exceptional leadership and deep product knowledge, becoming a vital asset to both the company’s customers and team members. Her ability to effectively convey the unique stories of it’s core… Read More…

  • Dainolite Expands Reach with New Lighting Agency Appointments

    Dainolite is thrilled to announce the appointment of several new commercial lighting agencies in the Ontario region. This strategic move is aimed at expanding the company’s market presence and enhancing it’s ability to deliver innovative decorative lighting solutions to the commercial industry. The new agencies, selected for their extensive industry expertise and strong market presence,… Read More…


Design

  • Project Story: Sainte-Thérèse High School Outdoor Lighting Upgrade

    Project Story: Sainte-Thérèse High School Outdoor Lighting Upgrade

    August 6, 2024 Built in 1980, the building that houses Sainte-Thérèse high school, in Quebec Canada, was looking a little worse for the wear. Renovation work began with two major projects: introducing a multidisciplinary sports centre, as well as redesigning the parking lots.  The employee and visitor parking lots were completely reconfigured during phase 1… Read More…

  • Resilience Illuminated: Reviving Westminster Pier Park After Devastating Fire

    Resilience Illuminated: Reviving Westminster Pier Park After Devastating Fire

    In September 2020, the picturesque city of New Westminster near Vancouver in British Columbia suffered a devastating setback when an intentionally set fire destroyed much of the city’s waterfront park, including its urban beach, sand volleyball courts, and iconic art installation known as Wow Westminster. The fire, which burned for ten days before firefighters could… Read More…


New Products

  • Magic Lite: Tri-Proof Lights

    Magic Lite: Tri-Proof Lights

    Tri-Proof Lights are a durable lighting solution that can replace traditional linear fluorescent luminaires. Tri-Proof Lights are designed for a variety of applications requiring, dust-, moisture- and impact-resistance. Suitable environments such as corridors, stairwells, warehouses, parking garages and car washes allows this versatile fixture in a variety of applications. Read More…

  • Leviton: Decora Smart ELV/LED Phase Selectable Dimmer, Wi-Fi 2nd Gen, Neutral Wire Required

    Leviton: Decora Smart ELV/LED Phase Selectable Dimmer, Wi-Fi 2nd Gen, Neutral Wire Required

    Introducing Leviton’s Decora Smart Electronic Low Voltage/LED Phase Selectable Dimmer Switch with Wi-Fi 2nd Gen., for 600VA ELV, 300W LED, 300W CFL, and 600W Incandescent/Halogen lights, with wallplate included. These switches come in white. Read More…