View of “Or Approved Equal” Products

July 23, 2018

John Kerr

From our view of the Canadian electrical industry and as a member of the industry that understands how our readers buy, specify, install and maintain electrical equipment nationally, we want to enter into “the approved or equal” debate that seems to be happening more often than not of late. We are hearing about this on commercial, institutional and industrial projects in all areas of the country.

Too often I have heard of presentations being made by many electrical equipment suppliers to consultants and consulting engineering firms where presentations are crafted to address specific needs and applications. The intention of presenting the firm’s products is to be named in the specification only to be told that “or approved equal” would be how they would amend the spec. 

“Or approved equal” is problematic. The supplier partners to the mechanical and electrical engineering community often assist consultants in designing a project, advise on best practices, and educate on the current Canadian codes and standards as they apply to the application. They provide product training, provide data, show precedents in other scenarios, and add value beyond the product offering.  

What we see is that not being listed in the specifications means that they are no longer on a level playing field with named products that may have been in the specifications for years without change and products that may no longer even apply in some cases.

For the consultant, using an old specification lists outdated products or manufacturers that may not even supply the required products, may no longer be available in Canada, and may no longer have the channel partnerships here to support it. 

Sadly, this is a lose/lose scenario for the industry as electrical contractors and electrical distributors are hesitant to believe that certain products are acceptable, even though it may have been the design standard on the project; but was not named because the standard specification, in use for years, was not revised.

Even in cases where the potential supplier is not named in a specification, but wishes to bid, they usually  include a covering statement to make the distributor aware that are acceptable to the consultant. Without the specific listing in the specification or on the drawings the distributors may not move and may not pass this information to the contractor. 

Unfortunately, if the distributor and contractor carry a product that is not named they risk the chance of being penalized should the product they carry in their quote not be acceptable to the consultant. 

The economic impact to the building owner is that single product suppliers named in specifications can and often do have a higher, non-competitive price. The result is that there is limited competition on the project and the building owner pays a higher price than they should for specified components in the building.

The economic impact to the consultant is the resulting loss of productive time spent reviewing and changing drawings and submittals multiple times to properly select the right equipment, especially when out-of-date specifications and drawings do not reflect current products, codes and practices. It’s surprising, given how competitive the consulting industry is, that these oversights continue. 

The reality is that many electrical equipment manufacturers and suppliers that commit to the Canadian market with staff and resources understand the Canadian needs and herein provide engineering assistance by reviewing projects. In this role they often catch small oversights and sometimes mistakes that avoid major extras. 

More often than not as a value-added component they provide this assistance at no cost, even though they bear the burden of the time and the cost of that time invested by their engineering staff. Too often local distributors and contractors are unable to take advantage of the new products and its features because of the fear the product may not be acceptable. 

The reality is product development continues, end users are demanding new solutions and more features, contractors want easier installation and reliable supply and distributors want Canadian partners.  

Maybe it’s time to have an open debate and open dialogue. From our point of view there are great products and solutions not being used today that could save time and money, as well as build better foundations for the future of the supplier, engineering, customer and wholesaler partnership.

Photo source: Tumisu at Pixabay.


John Kerr is Publisher of Canadian Electrical Wholesaler.

Related Articles


Changing Scene

  • CSC LED Announces the Appointment of Patrick Ndlovu as Branch Manager (AB)

    CSC LED is happy to announce that Patrick Ndlovu has joined their growing team as Branch Manager in Calgary, Alberta. With extensive experience as a journeyman electrician and a strong background in sales, Patrick brings together technical expertise and a deep understanding of market dynamics. His practical experience in the field, combined with his sales… Read More…

  • Maxlite Expands c-Max Network Partners Ecosystem With Casambi Technologies

    MaxLite is pleased to announce the recent expansion of its c-Max Network Partners ecosystem with the addition of Casambi Technologies, a provider of wireless lighting control systems. This strategic partnership further enhances MaxLite’s c-Max Lighting Controls platform, offering customers an even wider range of advanced wireless control options. The collaboration with Casambi strengthens MaxLite’s commitment… Read More…


Design

  • Project Story: Sainte-Thérèse High School Outdoor Lighting Upgrade

    Project Story: Sainte-Thérèse High School Outdoor Lighting Upgrade

    August 6, 2024 Built in 1980, the building that houses Sainte-Thérèse high school, in Quebec Canada, was looking a little worse for the wear. Renovation work began with two major projects: introducing a multidisciplinary sports centre, as well as redesigning the parking lots.  The employee and visitor parking lots were completely reconfigured during phase 1… Read More…

  • Resilience Illuminated: Reviving Westminster Pier Park After Devastating Fire

    Resilience Illuminated: Reviving Westminster Pier Park After Devastating Fire

    In September 2020, the picturesque city of New Westminster near Vancouver in British Columbia suffered a devastating setback when an intentionally set fire destroyed much of the city’s waterfront park, including its urban beach, sand volleyball courts, and iconic art installation known as Wow Westminster. The fire, which burned for ten days before firefighters could… Read More…


New Products

  • RENO Lighting Unveils AIM Series Architectural Indirect Curved Panel

    RENO Lighting Unveils AIM Series Architectural Indirect Curved Panel

    November 22, 2024 RENO Lighting is proud to announce the launch of the AIM Series Architectural Indirect Curved Panel. This innovative luminaire combines sleek design with advanced technology to deliver superior lighting performance for modern architectural spaces. The AIM Series pays homage to traditional edge-lit flat panels, featuring a slim profile ideal for low plenum… Read More…

  • RENO Lighting Launches the First New Long Detection Range (50ft) PIR Sensor

    RENO Lighting Launches the First New Long Detection Range (50ft) PIR Sensor

    November 22, 2024 RENO Lighting is proud to announce the launch of its new PIR (Passive Infrared) Sensor (R74004), designed to enhance lighting control on LED fixtures such as high bays and vapor tight fixtures with an impressive 50-foot detection range that is designed for installation heights of up to 50ft. This fixture-mounted sensor is the… Read More…